Results for "risg"
-
Applying to use land we manage: create a risk assessment
To apply to use land we manage, you will need to create a risk assessment
-
What to do before you apply for a standalone Medium Combustion Plant (MCP) less than 50 MW thermal input that is also a Specified Generator (SG) or Part B activity
Find out what information and risk assessments you must include with your permit application.
-
What to do before you apply for a standalone Medium Combustion Plant (MCP) permit between 1 and less than 20 MW thermal input
Find out how to prepare your application for a standalone MCP permit including what information and risk assessments you must include with your permit application.
-
Environmental Risk Assessments for discharges to water
If your discharge into surface water contains hazardous chemicals and elements, we may need to complete an Environmental Risk Assessment as part of assessing your permit application. This requires payment of an additional fee on top of the application fee for an Environmental Permit.
-
Waste standard rules and risk assessments
Check the waste standard rules that you can apply for
-
Audit and Risk Assurance Committee (ARAC) terms of reference
These specific terms of reference are to be read in tandem with the generic terms of reference for all Natural Resources Wales’ (NRW) committees.
- Check your coastal erosion risk (National Coastal Erosion Risk Management map)
- Carry out a risk assessment for a bespoke permit to deposit waste for recovery
-
Arrange a reservoir inspection
If you own or manage a high-risk reservoir you must arrange to have it inspected by a suitably qualified civil engineer.
-
Appoint a reservoir supervising engineer
If you own or manage a high-risk reservoir you must appoint a Supervising Engineer and tell us about this. This guidance explains what a Supervising Engineer does and help you appoint one.
-
21 Jul 2022
Natural Resources Wales releases extra water to reduce risk of fish mortalityNatural Resources Wales recently released extra water to the River Dee to reduce the risk of fish mortality during the exceptionally high temperatures experienced across Wales.
- Check your flood risk by postcode
- Check your flood risk on a map (Flood Risk Assessment Wales Map)
- Low risk impoundments
-
Apply for a low risk activities (band 1) marine licence
How to apply for a low risk actvities marine licence
-
Marine licensing low risk activities (band 1)
Find out the requirements for marine activities to be considered as Band 1 (low risk)
-
16 Apr 2020)
Gutter Fawr Outfall Flood Risk Management Scheme, TalacreAnnouncement of intention not to prepare an environmental statement - (Regulation 12B of the Environmental Impact Assessment (Land drainage improvement works) (Amendment) Regulations) 2017/585